Prove every SLA item - before the client asks
An SLA you cannot evidence is a liability, not a commitment. Parq.ai verifies each SLA item on the unit itself - inspection complete, condition report captured, target state of charge met - and blocks release until every item is proven. The evidence is a byproduct of doing the work, not a report someone assembles the week the client asks for it.
45,000+inspections recorded540,000+photos captured70,000+washes proven
Why SLA reporting fails at exactly the wrong moment
Most SLA reporting is retroactive. The work happens, a client raises something, and someone digs through photos, texts, work orders, and vendor emails to build a case. That reconstruction is where credibility is lost. It is not dishonest, but it is visibly assembled after the fact, and that invites the question of what was left out.
The second failure is variance. The same SOP produces different results at different sites, shifts, and vendors, because a checklist describes a process instead of enforcing it. A client auditing three of your sites should see three identical records. Three dialects of one process make the SLA aspirational.
What an enforcing checkpoint changes
A readiness gate is a checkpoint the unit must clear to advance. Each SLA item is verified on the record: inspection complete, condition report captured to your standard, state of charge at target. The unit cannot move through the vehicle lifecycle until all are proven. Nobody has to remember the standard, and nobody can skip it because the truck is waiting.
The consequence is that the evidence file assembles itself. Every task, photo, signature, and timer has already written to the VIN in the order it happened. When a client asks what condition a unit was in at handoff on a Tuesday in March, that is a lookup rather than a project.
The audit conversation
Three things carry an audit: a continuous chain of custody with a name and timestamp at every handoff, photo evidence captured to a defined standard, and a full audit log of who changed what and when. Exports go to your client, auditor, or compliance team in the format they need.
A record showing exceptions raised and cleared is more credible than a spotless one. A program with no exceptions in six months reads as a program that stopped recording them. Keep the exception trail - it is evidence that the controls are live.
What this looks like in your operation
Rental and mobility fleets. Damage disputes at return, and readiness standards you have promised corporate accounts. Both come down to what you can show about the unit's condition at a specific moment.
Auto logistics and remarketing. Your SLA is the product. Per-client configuration matters here more than anywhere else, because no two consignors define an acceptable condition report the same way.
Last-mile and delivery. Program standards flow down from a shipper, and compliance is assessed on aggregate performance across a large number of small events. Consistency at every site is what gets measured.
AV and robotaxi operations. Readiness attestation before a unit goes back into service is a safety process, not a paperwork process. It needs to be enforcing by definition, and the record needs to hold for far longer than a billing cycle.
What this does not cover
It proves what was recorded. It cannot rebuild history from before you turned it on, and it cannot evidence a step never performed. Security and uptime commitments are set in your contract, not asserted here. Ask for the security review during the demo and hold us to what is written.
Frequently asked questions
Yes. Gates, SLA items, and escalation paths are configured per client, program, or market in the workflow builder, without waiting on a software release. Storage, transport, wash, readiness, check-in, check-out, mechanical work, and condition report SLAs are all configurable.
A per-VIN history: every phase with timestamps, the custody signature at each handoff, the structured photo evidence captured at inspection, the SLA items verified at each gate, and the audit log of record changes. It exports in the format the auditor asks for.
Yes. Charger assignment and session proof are recorded, and target state of charge is one of the SLA items the readiness gate verifies before a unit can be released.
Terms used on this page are defined in the fleet operations glossary, including readiness gate, chain of custody, condition report.
Thirty minutes, screen-shared. We take one of your vehicles through every gate in the live product.